Assignment #6


This page contains assignment #6 for Performance Evaluation. This assignment is due on Monday, November 22 in class. Any solutions that you find "on the web" must be referenced as such. Please start each problem on a new sheet of paper and put your name on all sheets of paper.



  1. Modify the CSIM M/M/1 simulation model (available here) to model M/D/1. Include theoretical results for M/D/1 (i.e., in the same manner as the M/M/1 model includes theoretical results). Set the service rate of the model to be 1 customer per second. Then, execute the model for offered loads of 70% to 98% in offered load increments of 4%. Plot the results for mean response time. Do this for simulation times of 1000, 10,000, and 100,000, seconds per data point (i.e., per offered load value). Plot also the theoretical results. Comment on the closeness of the simulation results to the theoretical results.

  2. Submit for review a first draft of your project paper and/or your experiment design and results for review.
Last update on November 8, 2004